The Problem
A Vancouver fire hall had ceiling stains in the apparatus bay and crew quarters. Emergency response could not be compromised.
Detection Method
Drone thermal survey during a rain event identified wet insulation and a failed membrane seam above the apparatus bay.
Results
Repair during a planned 48-hour station closure with coverage redistributed. Chief now schedules annual drone thermal for all stations.